Emissions Testing | July 12, 2010 – Prepared a generator for emissions testing. A device is hooked up to the generator which will use power to the generator’s capacity, allowing a more accurate and stable reading of emissions.
Weatherford CVR | July 13, 2010 – Obtained a water sample from the Red Desert 13-4 well. This sample is used by the lab to determine the optimal surfactant to use to decrease the density of the well fluid. The fluid sample also gives insights to pH and chloride levels so we can select the proper grade of steel capillary tubing.
Weatherford CVR | July 14, 2010 – Worked on communicating with the rest of the people involved in this project to finalize the logistics and collect the required parts. Coordinated anchor testing and slickline to prepare the well for pulling.
Weatherford CVR | July 15, 2010 – Worked on an authorization for expenditure (AFE) for the CVR project. Each cost needs to be itemized so we know approximately how much we will spend on this well. After detailing all of the costs, the AFE is distributed throughout the team for approval.
Weatherford CVR | July 16, 2010 – Began installation of the CVR application. Rigged up and pulled the tubing from the well and laid 31 pieces out which will not be used for the final installation.